What is the quota for the weathered rock set

In recent years, with the rapid development of infrastructure projects, the construction quota of the middle weathered rock has become the focus of industry attention. This article will analyze the quota standards for weathered rocks in the past 10 days in combination with popular topics and hot contents on the entire network, and provide structured data for reference.

1. Definition and engineering characteristics of the weathered rock

What is the quota for the weathered rock set

Stromalized rock refers to a rock mass whose strength is between strong weathered rock and mild weathered rock after long-term weathering. Its engineering features include:

1. The rock mass structure is partially damaged, but the integrity is good;
2. Medium strength and moderate excavation difficulty;
3. Commonly used in slopes, tunnels and other projects.

2. Analysis of popular topics on the entire network in the past 10 days

Through searching the hot content of the entire network for the past 10 days, we found that the following topics related to Shishishishi rock are more popular:

topicPopularity indexMain discussion content
Dispute on the quota of excavation of the weathered rock85The quota standards in each region are not unified
Rationale weathering criteria78How to accurately divide weathering levels
New rock crushing technology72Improve the construction efficiency of the weathered rock
Slope support project case65Experience in treating side slopes of weathered rocks

3. Standard for construction quota of weathered rocks

According to the current project quota standards, the main construction quotas for the middle weathered rock are as follows:

Construction contentunitMachinery excavation quotaManual excavation quota
Foundation pit excavation0.35 working days0.85 working days
Tunnel excavation0.45 working days1.05 working days
Slope trimming0.15 working days0.35 working days

4. Analysis of factors affecting quota

The construction quota of weathered rocks is affected by a variety of factors, mainly including:

1.Rock hardness: The value of Platz hardness coefficient f is between 2-4;
2.Fracture development degree: The crack spacing is 20-50cm;
3.Construction environment: Groundwater level, working space, etc.;
4.Construction machinery:Efficiency of equipment such as breakers, excavators, etc.

5. Comparison of quotas in each region

There are differences in the quota standards for weathered rocks in different regions:

areaFoundation pit excavation (mechanical)Tunnel excavation (mechanical)Remark
East China0.32 working days/m³0.42 working days/m³Including transportation 30m
South China0.38 working days/m³0.48 working days/m³Including transportation 50m
Western Region0.42 working days/m³0.52 working days/m³Including 100m transportation

6. Construction suggestions

For the construction of the weathered rock, we make the following suggestions:

1. Detailed geological surveys must be conducted before construction to accurately determine the rock weathering level;
2. Select appropriate construction machinery and processes according to the actual situation of the project;
3. Refer to local quota standards, but adjust them according to specific project characteristics;
4. Pay attention to construction safety, especially slope projects, support measures should be taken.

7. Conclusion

The determination of quota for weathered rocks requires comprehensive consideration of multiple factors. With the advancement of construction technology, the quota standards are also being updated. It is recommended that engineering personnel pay attention to the latest quota information in a timely manner and reasonably determine the construction plan based on the actual situation of the project. At the same time, we also hope that the industry can introduce more unified quota standards to reduce the controversy caused by regional differences.

Next article
  • What is CT current?In the field of power systems and electronic measurement,CT current(Current Transformer, current transformer) is a device used to measure alternating current. It converts high current into low current through the principle of electromagnetic induction, which facilitates safe measurement and monitoring. This article will combine the hot topics on the Internet in the past 10 days to give a structured
    2026-01-25 mechanical
  • What does overshoot mean?In the field of control engineering and automation,OvershootIt is a very important concept, which describes the phenomenon that the output exceeds the steady-state value during the system response process. This article will explain in detail the definition of overshoot, its calculation method, and its significance in practical applications.1. Definition of overshootOvershoot refers to the per
    2026-01-22 mechanical
  • What is a flange gland?In the industrial field, flange glands are a common sealing component and are widely used in the connection and sealing of pipelines, valves, pumps and other equipment. Its main function is to prevent fluid leakage and ensure the safe operation of the system. This article will introduce in detail the definition, structure, application scenarios of flange glands, as well as hot topics and hot co
    2026-01-20 mechanical
  • What does sulfur dioxide do?Sulfur dioxide (SO₂) is a common chemical substance widely used in industry, food, medicine and other fields. Although it has certain toxicity, when used rationally, sulfur dioxide plays an irreplaceable role. The following is a summary of the main functions of sulfur dioxide and related hot topics.1. Industrial applications of sulfur dioxideSulfur dioxide is mainly used in industry to m
    2026-01-17 mechanical
Recommended articles
Reading rankings
Friendly links
Dividing line